Fallen rockfall is a danger in the ambush of pedestrians and cars

In autumn, with the increase of constructions in Tehran and other cities, we see the fall of the stones of multi-storey buildings that have not been executed properly.
According to the International Iranian Stone Exhibition, falling rocks and building facades pose many dangers to pedestrians, parked cars and people living on these streets.
The main reasons for the collapse of the facade stones were the difference in the coefficient of expansion of stone and cement, as well as the high use of dry cement for faster drying or incorrect execution of the scoponema.
In case of an accident of falling facade stone, you can contact the height company of the site, which provides the facade screw and dowel service.
Here are some steps you can take to begin the process of preparation for mediation:
The first step is to make the environment safe. Dragging the danger bar, closing the rock fall area, placing a sign for pedestrians and car parks.
The second step is to contact the company of height workers to secure and send an expert
How to determine the probability of falling building facades
The stones of the building first pile up and the stone blocks fall off, and sometimes the facade stones crack and start to fall. Therefore, it is necessary to visit the façade in order to control the stones if you see a stone slab or cracks before the accident. Or the mouse teeth as well as the columns on the façade start to fall, which is a warning. If the façade stones are not restrained, the body stones will start to separate from the back mortar and fall.
Renovated facades usually start to fall off within 3 to 5 years if they are not scooped. If you have a wire scoop, they start to fall off within 12 to 15 years after the scope wires rot, and if you are not sure the facade stones are scoped. Whether or not it is better to check the strength of the masonry before the masonry falls and the accident occurs.
Who is responsible for the fall of Sangnama?
In the event of a rockfall falling on parked cars, pedestrians or any other damage, one of these four people is generally responsible.
. Manufacturer or performer
. construction supervisor
. Building's manager
. Owners
If the building is new, the builder or the executor is to blame, and if the building is old, the manager or owners are to blame and must take legal action to compensate for the damage.
The site's group of height workers suggests that before any accident occurs, you should screw, retrofit, and insure your building. It is interesting to know that scaffolding does not need to be done to perform facade screws, but you can use the rope height consulting services. Use to get the job done.
The important point is that the company providing these services is very important because in case of incorrect execution of screws and roofing, it creates more risks for the building.
One of the leading companies in providing scaffolding-free facade services such as facade screws and dowels is Karan Sait Company. The technicians of this company work with years of experience as well as modern engineering science and suitable tools in the field of working with rope at height.
Elevation workers with their expert team in the field of washing the facade, screws and dowels of the facade of the building, as well as using new technologies such as nano, are ready to serve and provide the necessary advice in these areas to our dear customers.
* ISNA