A large stone-cutting unit will be built in Takab

A large stone-cutting unit will be built in Takab
  • 2020-10-04
  • .
The Deputy Minister of Mines of the Industry, Mining and Trade Organization of West Azerbaijan Province announced the construction of a large-scale stone-cutting unit in Takab to prevent the sale of raw minerals.

According to the International Stone Exhibition of Iran, Parisa Abedpour, stating that Takab with 2 gold mines and 49 stone mines is one of the most important mineral hubs in the country, added: to prevent the sale of raw decorative stones extracted from Takab 1 mines Large-scale quarrying unit will be constructed to remove the extracted materials from this city after processing and to return its added value to this city.

He added: 2 large gold mines are active in this city, which annually extract one million and 85 thousand tons of gold minerals and process them in the head of the mine. These units, with an investment of one thousand and 18 billion Rials, provide direct employment for 715 people have prepared.

Deputy Minister of Mines of the Industry, Mining and Trade Organization of West Azerbaijan added: "Good infrastructure measures in the region have been created from the receipt of revenues from government mines Takab city, including electricity, water supply and access roads to the mines. They have benefited from this infrastructure.

Abedpour, stating that in the industrial town of this city, industrial units with up-to-date technology are operating, added: including the inclusion units of Takab, a manufacturing company with a product of synthetic fibers made of polyethylene, which has invested 70 billion in direct employment for 9 people. Provided.

He said that in Takab, due to the existence of large gold mines and its extraction and processing units, there is a favorable ground for the establishment of downstream gold and silver production units, including ornaments, he said: a union unit producing all kinds of gold jewelry with The volume of investment is more than 40 billion Rials and the creation of direct employment for 7 people has been directly active in Takab and has provided the ground for youth self-employment.

He reminded: Takab has 63 mines with valid exploitation licenses with a definite reserve of 49 million and 235 thousand tons of minerals, which has provided the field of direct employment for a significant number of local people in the region.

Zareh Shoran, the largest gold production complex in the country and the Middle East, is located in Takab city, next to the Aq Dareh gold mine, where the gold processing and extraction unit is located at the foot of these two mines.