Abbas Karbala'i: I'm ready to launch Hepco
Abbas Karbalaie, one of the top entrepreneurs in Markazi province, said that he was ready to enter the Hepco problem.
Abbas Karbalaie, one of the top entrepreneurs in Markazi province, in an exclusive interview with Iran Stone Exhibition said: "During a meeting with senior officials in Markazi province, we also talked about" Hepco "and I announced my readiness to enter the" Hepco "issue. . I will take action if the terms of the Hepco transfer are appropriate.
He said: "My goal is to get into the" hepco "problem of setting up this plant in the best possible way and providing the necessary platforms for the right work and effort and producing export products at the plant.
He said: "To this day, about 50 years of my professional career, until I have gone into banking facilities, if I have to do something about Hepco as far as I can not go to facilities. Roman, of course I have to check to see what the terms of the Hepco transfer are.
He continued: One of my main jobs is heavy machinery and its equipment that many of these heavy machinery are imported from abroad, this is my thirty-year specialty and is well suited to the needs of miners and parts and machine tools needed This is an industry I know.
He added: "There are about 6,000 ore mines in Iran where most of this machinery is imported from abroad. With the launch of" Hepco "this market can be Iranian production and reduce our dependence on foreign.
He emphasized: For the production of heavy machinery we have to look in the direction that we can produce export products and our focus is not only on Iranian markets. If heavy machinery is to be manufactured, it must be performance such as "Komatsu" or "Caterpillar" that deliver their products all over the world.
He said: In addition to heavy machinery, which is one of my main occupations, I also work in the field of mining. Our active mines are the Oligodarz Mines, Haji Abad Travertine, Atakuh Mahalat, Chinese Leibid, Jusghan Marble, Taravin Torq and Lushan Cement.
Abbas Karbala'i said: "We have also built the Arya Hotel on the first hill of the neighborhoods, which God willing will launch next year and has 14,000,meters under construction." The hotel has fifty-eight rooms and, with its launch, it can be hoped that much of the housing problems of the neighborhood will be resolved, especially at the time of the exhibition.
He also stated: Another of our measures is the construction of Nima Hall with capacity of Hazaras and 400 people. It's also been about a year since we started building the 12,000-foot-long water park in Nimar, which is about two years into operation.
He said: "Based on my experience in the field of heavy machinery, I have built an exhibition of machinery, parts and tires for heavy machinery in the city of Nim twenty-three thousand meters. The construction of a school in Mehr Mahalat Residential Complex is another humble move. The school was opened in 2016 and has continued to operate successfully.